Voyageur Upgrader
Facility Type: Upgrader
Scope: Expansion
Owner: Suncor Energy
Location: Fort McMurray  Canada
Region: North America
Modified:  January 30, 2009
Images:


Project description

Suncor's Voyageur Upgrader project entails building a third oil sands upgrader (U3) southwest of existing facilities near Fort McMurray, Alberta. It is a key component of Suncor's CDN$20.6-billion plan to have a 550,000-b/d synthetic crude production capacity by 2012--up from its expected 2008 synthetic crude production capacity of 350,000.

The new CDN$4.4-billion U3 facility will feature a sulfur complex that includes the following: two sour water stripper units, one amine unit, three sulfur recovery trains, sulfur degassing, LT SCOT tail gas treating unit,and a sulfur truck loading terminal. It will upgrade approximately 245,000 b/d of bitumen feedstock--primarily from the Firebag in situ oil sands site--into 200,000 b/d of synthetic crude oil. In a May 2008 investor presentation, Suncor stated that it expects U3 to help it maintain a competitive capital cost position based on the economies of scale associated with a 200,000 b/d facility.

The planned synthetic crude product mix for U3 is 85% sweet/diesel and 15% sour. In contrast, the product mixes for the first and second upgraders (U1 and U2, respectively) are 60% sweet/diesel and 40% sour for U1 and 45% sweet/diesel and 55% sour for U2. Once U3 is completed, Suncor expects to have a product mix from all three upgraders of 60% sweet/diesel and 40% sour.

On June 17, 2008, Jacobs Engineering Group Inc. reported that Suncor awarded it a contract to provide detailed engineering, procurement, and construction services for the sulfur complex. Two months earlier WorleyParsons announced that its Canadian subsidiary, Colt WorleyParsons, had won an engineering and procurement services related to the upgrader's hydro-treaters.

In January 2009, Suncor's board cut by one-half the company's $6-billion capital spending plan for 2009. One-third of the revised spending plan, or approximately $1 billion, has been earmarked for growth projects. The remaining two-thirds will go to base business operations. As a result of the move, construction on the Voyageur Upgrader and Firebag Stage 3 will be suspended and placed in what the company calls a "safe mode." A restart date for construction and completion for these projects, along with start-up and completion targets for other expansion projects, has not been determined.

According to Suncor, capital growth plans are being reviewed on a quarterly basis in response to current unfavorable market conditions.

  Key Stats
Major process units:
two sour water stripper units; one amine unit; three sulfur recovery trains; sulfur degassing; LT SCOT tail gas treating unit; sulfur truck loading terminal
Products:
synthetic crude oil
Construction type:
expansion
Post project capacity:
200,000 b/d
Project cost:
CDN$4.4 billion
Contractors:
Jacobs Engineering Group Inc. (engineering, procurement, and construction services for the sulfur complex); WorleyParsons (engineering and procurement services for hydro-treaters)
Project completion date:
To be determined
  Related Articles
TransCanada To Build C$660 Million Pipeline For Suncor Oil Sands Project
Aug 01, 2012 - TransCanada Corp. (TRP) said Wednesday it has been selected to build a 660 million Canadian dollar (US$659 million) pipeline for an oil-sands project under development by Suncor Energy Inc. (SU) and Total SA (TOT).
Suncor Finalizes Oil Sands Plans with Total
Mar 23, 2011 - Suncor Energy Inc. announced Tuesday that it has finalized its strategic alliance with Total E&P Canada Ltd. after receiving all required approvals and successfully meeting all other conditions.
Total, Suncor Sign Strategic Alliance on Oil Sands
Dec 17, 2010 - Total and Suncor are forming a strategic alliance in Canada's oil sands. As a result, FEED work will resume on a suspended upgrader project.
Financial Crisis Hits Global Energy Investment
Jan 28, 2009 - The deepening of the global financial crisis and the sharp drop in energy prices have forced companies to scale back spending and delay projects, with expensive ventures in the Canadian oil sands hardest hit.
Suncor Reports Lower Earnings for 2008, Loss for Q4
Jan 20, 2009 - Suncor Energy Inc. on Tuesday reported 2008 net earnings of $2.137 billion ($2.29 per common share), compared to $2.983 billion ($3.23 per common share) in 2007.
Suncor Awards Jacobs EPC Contract for Voyageur
Jun 17, 2008 - Jacobs Engineering Group Inc. announced Tuesday that it has received a contract to provide detailed engineering, procurement, and construction (EPC) services for Suncor Energy's Voyageur Upgrader near Fort McMurray, Alberta, Canada.
Honeywell To Deploy Simulation Tech At Suncor Voyageur Expansion
May 15, 2008 - Honeywell on Wednesday announced it has been selected to provide operator training simulator technology for Suncor Energy Inc.'s Voyager Oil Sands Upgrader Operation in Northern Alberta.
Suncor Posts Higher Earnings for Q1
Apr 24, 2008 - Suncor Energy Inc. on Thursday reported first quarter 2008 net earnings of $708 million ($1.53 per common share), compared to $576 million ($1.25 per common share) in the first quarter of 2007.
WorleyParsons Wins Contract for Voyageur Upgrader Project
Apr 10, 2008 - Colt WorleyParsons has awarded a contract by Suncor Energy for engineering and procurement (E&P) services related to the hydro-treaters for the planned Voyageur Upgrader Project located near Fort McMurray in northern Alberta, Canada.
Suncor Backs Away from US Refining JV
Jan 22, 2008 - Suncor Energy Inc. (SU) is unlikely to follow its Canadian oil sands peers in teaming up with a U.S. refiner, preferring to buy a refinery when asset prices fall, Chief Executive Rick George said Tuesday.
Suncor to Boost Bitumen Supply with Voyageur South Expansion
Jul 31, 2007 - Suncor Energy Inc. on Monday filed a regulatory application for a $4.4-billion plan that would provide feedstock flexibility for the company's upgrading facilities near Fort McMurray, Alberta.
Suncor Initiates Regulatory Process to Expand Oil Sands Mining
Feb 27, 2007 - Suncor Energy initiated the regulatory approval and stakeholder consultation process on plans to develop an expanded oil sands mining operation when it filed a public disclosure document with government officials



Home || Jobs || News || Projects || Events || Glossary